Draft DAO on Electric Wires and Cables

Draft DAO on Electric Wires and Cables

Comments shall be accepted by BPS within 60 days after the public consultation or until 24 January 2022. Position papers shall be submitted by the concerned stakeholders to Director Neil P. Catajay at This email address is being protected from spambots. You need JavaScript enabled to view it..

File Name: Final Draft DAO on Electric wires and cables_11.22.2021_rev1.pdf
File Size: 906.25 KB
File Type: application/pdf